inner-banner

संग्रहण प्रसिध्दीपत्रक आणि प्रकाशित बातम्या

संग्रहण प्रकाशित बातम्या
Sr. No. Title Start Date End Date Download/Details
41 3 tier station of metro line 9 is 65% completed 13-03-2023 13-03-2024 Download(1.09 MB)3 tier station of metro line 9 is 65% completed बातम्या
42 1st composite steel girder span erected at Sewri side in MTHL project 22-02-2023 22-02-2024 Download(1.28 MB)1st composite steel girder span erected at Sewri side in MTHL project बातम्या
43 Hon. Chief Minister Shri. Eknath Shinde Inaugurated Kopri ROB 14-02-2023 14-02-2024 Download(1.66 MB)Hon. Chief Minister Shri. Eknath Shinde Inaugurated Kopri ROB बातम्या
44 Hon. Prime Minister Inaugurated MMRDA's another two important infrastructure projects just after Metro 14-02-2023 14-02-2024 Download(3.45 MB)Hon. Prime Minister Inaugurated MMRDA's another two important infrastructure projects just after Metro बातम्या
45 Mumbai's First North-South & East-West Connectivity 66% Complete 14-02-2023 14-02-2024 Download(628.97 KB)Mumbai's First North-South & East-West Connectivity 66% Complete बातम्या
46 Surya Regional Water Supply Scheme is on the verge of completion. 01-02-2023 01-02-2024 Download(2.12 MB)Surya Regional Water Supply Scheme is on the verge of completion. बातम्या
47 Tunnel (LHS) in Parsik Hills was opened from both sides using a controlled blasting method In the presence of the Hon. Chief Minister 30-01-2023 30-01-2024 Download(1007.52 KB)Tunnel (LHS) in Parsik Hills was opened from both sides using a controlled blasting method In the presence of the Hon. Chief Minister बातम्या
48 A Million plus commuters travelled within a week on Metro 2a and 7 since it was inaugurated by Hon. Prime Minister of India 30-01-2023 30-01-2024 Download(1.2 MB)A Million plus commuters travelled within a week on Metro 2a and 7 since it was inaugurated by Hon. Prime Minister of India बातम्या
49 Civil Work of Lt. Balasaheb Thackeray Rashtriya Smarak 65 % Completed 25-01-2023 25-01-2024 Download(796.7 KB)Civil Work of Lt. Balasaheb Thackeray Rashtriya Smarak 65 % Completed	बातम्या
50 MUMBAI METRO LINES 2A AND 7 (PHASE 2) DEDICATED TO MUMBAIKARS BY HON. PRIME MINISTER SHRI. NARENDRA MODI 20-01-2023 20-01-2024 Download(4.59 MB)MUMBAI METRO LINES 2A AND 7 (PHASE 2) DEDICATED TO MUMBAIKARS BY HON. PRIME MINISTER SHRI. NARENDRA MODI बातम्या
51 MMRDA received CMRS Certificate 16-01-2023 16-01-2024 Download(687.85 KB)MMRDA received CMRS Certificate बातम्या
52 Andheri (W) station consist of 3 levels 16-01-2023 16-01-2024 Download(692.52 KB)Andheri (W) station consist of 3 levels बातम्या
53 Longest OSD of MTHL pkg 2 Launched in the presence of Hon. Chief Minister 12-01-2023 12-02-2024 Download(1.17 MB)Longest OSD of MTHL pkg 2 Launched in the presence of Hon. Chief Minister बातम्या
54 Mega block for testing of integrated signaling system on Metro Line 2A &7 10-01-2023 10-02-2024 Download(718.86 KB)Mega block for testing of integrated signaling system on Metro Line 2A &7 बातम्या
55 10 Metro Stations Of Line 7 Awarded with Highest Ranking of Green Building Initiative. 10-01-2023 10-02-2024 Download(197.06 KB)10 Metro Stations Of Line 7 Awarded with Highest Ranking of Green Building Initiative. बातम्या
56 Year of project completion 2023 02-01-2023 02-01-2024 Download(2.22 MB)Year of project completion 2023 बातम्या
57 Metro Depot #MMRDA Milestone , More than 50% civil work completed 28-12-2022 28-01-2023 Download(7.42 MB)Metro Depot #MMRDA Milestone , More than 50% civil work completed बातम्या
58 MMRDA started installation of 1550 mm high crash barriers on MTHL 27-12-2022 27-01-2023 Download(779.56 KB)MMRDA started installation of 1550 mm high crash barriers on MTHL बातम्या
59 70 % Civil works were completed in Phase 1 of Metro Line 5 23-12-2022 23-12-2023 Download(791.48 KB)70 % Civil works were completed in Phase 1 of Metro Line 5 बातम्या
60 MMRDA started installation of 1550 mm high crash barriers on MTHL 23-12-2022 23-01-2023 Download(779.56 KB)MMRDA started installation of 1550 mm high crash barriers on MTHL बातम्या