Metro Line- 2A
Mumbai Metro Line 2A (DAHISAR - D.N. NAGAR)
- Metro Line 2A from Dahisar to D N Nagar is 18.6 km. long elevated corridor with 17 stations.
- It shall provide interconnectivity with Metro Line 1 (Ghatkopar to Versova), the ongoing Metro Lines 2B (D N Nagar to Mandale) & 7 (Andheri (E) to Dahisar (E)) and the Metro Line 6 (Swami Samarth Nagar to Vikhroli).
- The maintenance depot on 16.40 hectares of land has been constructed for the stabling and maintenance of the trains at Charkop/Malwani & inaugurated by Hon’ble Chief Minister on 29th January 2021.
- This project will help ease in traffic congestion on one of the busiest route (New Link Road) of Mumbai from Dahisar (E) to DN Nagar.
- It shall facilitate smooth and efficient interchange with the suburban rail system and MRT system at Dahisar and D N Nagar.
- It shall provide connectivity between the Western, Central Mumbai and the Northern suburban Mumbai.
- It shall provide rail based access to the commercial and geographical landmarks in Mumbai.
- It shall reduce the current travel time by anything between 50% and 75% depending on road conditions.
86
Length | 18.6 km (Elevated) | |
Line Color | Yellow Line | |
Stations | 17 Nos. (All Elevated) | |
1. Dahisar(East), 2. Anand Nagar, 3. Kandarpada, 4. Mandapeshwar-I C Colony, 5. Eksar, 6.Borivali(West), 7. Pahadi Eksar, 8. Kandivali(West), 9. Dahanukarwadi, 10. Valnai, 11. Malad(West), 12. Lower Malad, 13. Pahadi Goregaon, 14. Goregaon (West), 15. Oshiwara, 16. Lower Oshiwara, 17. Andheri (West) | ||
Elevated / Underground | Elevated along Link Road | |
Interchange stations for Metro |
|
|
Project completion cost | Rs. 6,410 Cr. ((including state taxes and 7.5% p.a escalation & IDC) | |
Ridership : | ||
2031 | Daily Ridership - 6.09 Lakhs (PHPD 15565) |
87
- Phase I (Dahisar- Dahanukarwadi)–
9.8 km with 9 stations (Dahisar(East), Anand Nagar, Kandarpada, Mandapeshwar-I C Colony, Eksar, Borivali(West), Pahadi Eksar, Kandivali(West), Dahanukarwadi) was commissioned on 2nd April, 2022.
- Phase II (Dahanukarwadi –D N Nagar) –
8.8 km with 8 stations (Valnai, Malad(West), Lower Malad, Pahadi Goregaon, Goregaon (West), Oshiwara, Lower Oshiwara, Andheri (West)) is operational from 19th January, 2023.
88
89
Loading content ...