Metro Line - 1
Mumbai Metro Line 1 (Versova-Andheri-Ghatkopar Metro Project)
- Versova-Andheri-Ghatkopar corridor is 11.40 km elevated corridor.
- It provided connectivity of Eastern & Western suburbs to Western & Central Railway.
- Facilitates smooth and efficient interchange between suburban rail system and MRT System at Andheri and Ghatkopar Stations.
- Reduced the Journey time from 71 minutes to 21 minutes, between Versova and Ghatkopar.
- Provide rail based access to the MIDC, SEEPZ and commercial developments.
67
1 | Route length | 11.40 km (Elevated) |
2 | Number of Total Station | 12 |
3 | Platform Length | 135 m (6 Coaches) |
4 | Car Depot | D. N. Nagar |
5 | Length of Coach | 22 m |
6 | Max. Speed | 80 kmph |
7 | Average Speed | 35 kmph |
8 | Seating Arrangement | Parallel to Coach |
9 |
4 Coach Capacity 6 Coach Capacity |
1178 Passengers 1792 Passengers |
10 | Estimate Ridership |
2021- 6.65 lakhs per day (PHPDT - 23,321) 2031- 8.83 lakhs per day (PHPDT - 30,491) |
11 | Environment in Coach | Air Conditioned |
12 | Ticketing System | Automatic Collection |
13 | Interchange facilities |
|
68
Project Name | Versova-Andheri- Ghatkopar Metro Corridor (Fully Elevated) |
Format | PPP (Public Private Partnership) |
Project Implementing Agency | Mumbai Metro One Private Limited |
SPV | Mumbai Metro One private Limited (MMOPL) a Special Purpose Vehicle (SPV) has been incorporated jointly by Mumbai Metropolitan Region Development Authority (MMRDA), Reliance Energy Limited (REL) and Veolia Transport France for implementation, operation and maintenance of Mass Rapid Transport System (MRTS) along Versova- Andheri- Ghatkopar (VAG) corridor.. |
Total project completion cost | Rs. 2,356 cr. |
VGF | Rs. 650 cr. |
Implementation period | 2007-2012 (As per Concession Agreement) |
Stations from Versova to Ghatkopar :
Sr. No. | Station Name |
1 | Versova |
2 | D. N. Nagar |
3 | Azad Nagar |
4 | Andheri |
5 | Western Express Highway |
6 | Chakala |
7 | Airport Road |
8 | Marol Naka |
9 | Sakinaka |
10 | Asalpha Road |
11 | Jagruti Nagar |
12 | Ghatkopar |
69
The work of Metro Line-1 project is completed and opened for public use on 8th June, 2014. The average daily ridership is approximately 3 Lacs.
70
The Concession Agreement of Metro Line-1 :
- Schedule IV A (70.75 MB)
- Schedule IV B (70.75 MB)
- Schedule IV C (70.75 MB)
- Volume 2 (70.75 MB)
- Volume 1 (70.75 MB)
- Volume 2B - Drawings (70.75 MB)
- Volume 3B - Performance Requirements (70.75 MB)
- Technical Proposal Volume 2 (70.75 MB)
- Technical Proposal Volume 1 (70.75 MB)
- Financial Proposal (70.75 MB)
- Volume 3A - Performance Requirements (70.75 MB)
72